Forgotten Password?

Register ID Now!

Members benefits

KeyWord: 

Click here to download shortcut link.
click/ press run twice – this will install link on your desktop direct for access to Ekspan home & product page.

 

Please visit the Ekspan Facebook by clicking the following button.
facebook

Please visit the Ekspan Youtube Channel by clicking the following button.
Youtube

Tel: 0044 (0) 114 2611126
Fax: 0044 (0) 114 2611165
Email: enquiry@ekspan.co.uk
Address: Compass Works, 410 Brightside Lane, Sheffield, S9 2SP, UK

SupportProject ReferencesCase Studies

At Ekspan we do not compromise the principles of good design, good material specification and skilled workmanship in the face of tendering competition. We are dedicated to providing the best product and the best value engineering with optimum whole-life ´pay back´.

There are no boundary limitations - our goal is to maintain the successful longevity of business with our customers both in UK, and world-wide industrial and structural markets.

 

We supply many standard and modified components but when those awkward to get items appear we will do all that we can to support the special needs of our valued customers.

 

Your budget may go further than you think.
For existing structures we offer an inspection service where our experienced engineers will report on the condition of your structural component such as a bearing.
Servicing, refurbishment or lubrication may be an economic alternative for extending an operational life.

 

Saving money by timely completion of contracts is key to our quality of supply.

 

Full project management including sub contract services results in the successful completion of many projects.
For example, the expansion joint refurbishment on the busy A40(M) Westway was completed ahead of schedule, not only saving money but the effects of congestion in central London.

 

We offer a complete range of bearings and structural elements designed specifically for applications where articulated support is required, such as machinery, pipelines and offshore structures.
If you have a special requirement we can design & manufacture a bearing to suit.
We are especially conversant with problems involving hostile environments, extremes of temperature and corrosion.

A370 LONG ASHTON BYPASS

Project Team
Client: North Somerset Council
Client Consulting Engineer: Arup
Main Contractor Consulting Engineers: Cass Hayward & Partners
Main Contractor: Makers Civil Engineering
Start Date: December 2003
Completion Date: April 2004 (supply)

BOYNE BRIDGE

Project Team
Client: Meath County Council
Consulting Engineers: Northconsult
Main Contractor: Siac Cleveland J.V
Start Date: 2001
Completion Date: June 2003

CHALLEYMEAD BRIDGE

Project Team
Client: Wiltshire County Council
Consulting Engineers: Ringway Parkman
Main Contractor: Dean & Dyball
Start Date: Spring 2003
Completion Date: Summer 2004

SOUTHPORT MARINE PARADE LINK BRIDGE

Project Team
Client: Sefton Borough Council
Consulting Engineers: Babtie
Main Contractor: Balfour Beatty, Construction Limited
Start Date: November 2002
Completion Date: April 2004

THE FALKIRK WHEEL
Project Team
Client: British Waterways, Scotland
Structural Consultant: Tony Gee & Partners
Mechanical Consultant: Bennett Associates
Main Contractor: Morrison Bachy, Soletanche JV
Sub Contractor: Butterley
Start Date: 2000
Completion Date: 2002

M1 TINSLEY VIADUCT

Project Team
Clients: Highways Agency, Yorkshire Water
Design Consultants: Owen Williams Ltd
Main Contractor: Edmund Nuttall Ltd
Sub Contractors: Cleveland Bridge UK, Ekspan Ltd.
Start Date: 1986
Completion Date: 2004

MIDLAND EXPRESSWAY
Project Team
Client: Midland Expressway Ltd.
Client Consulting Engineer: Babtie
Main Contractor Consulting Engineers: AAJV
Main Contractor: CAMBBA
Steelwork Contractor: Fairfield Mabey
Start Date: June 2001
Completion Date: December 2004

ROYAL ALBERT BRIDGE

Project Team
Client: Railtrack
Consulting Engineers:Hyder Consulting
Main Contractor: Dean & Dyball
Sub Contractor: Ekspan Ltd
Start Date: January 2000
Completion Date: May 2000

EAST LONDON LINE ENABLING WORKS

Project Team
Client: TFL
(Transport for London)
Main Contractor: Taylor Woodrow
Consultant Engineer: Faber Maunsell
Start Date: 2005
Completion Date: 2007

LADYBOWER BRIDGE

Project Team
Client: Severn Trent Water
Client Consulting Engineer:
Severn Trent Water
Main Contractor: Norwest Holst
Start Date: 2002
Completion Date: 2003

THE PALACE OF PEACE, ASTANA KAZAKHSTAN

Project Team
Client: President Nursultan Nazarbayev
Architect: Foster and Partners
Main Contractor: Sembol Construction
Start Date: October 2005
Completion Date: June 2006

PINTLE BEARINGS FOR SWING BRIDGES

Project Team
Client: British Waterways
Engineer: British Waterways, Contractors: Various
Projects: Bells Lane Swing Bridge, Glovers Swing Bridge, Bradley Swing Bridge
Marsh Meadow Swing Bridge
Bethells Bridge, Brigham Bridge, Rimmers Swing Bridge
Start Date: 2000 onwards
Completion Date: Ongoing

HYDRO-ELECTRIC HIGH HEAD PIPELINE SADDLE REFURBISHMENT

Project Team
Client: NPower
Main Contractor: Ekspan Ltd.
Start Date: 2006
Completion Date: Ongoing

TAMAR BRIDGE - CABLE INSPECTIONS & MAINTENANCE

Project Team
Client: Cornwall County
       Council
Consulting Engineers: Faber Maunsell Ltd
Main Contractor: Ekspan Ltd.
Start Date: 26 August 2008
Completion Date: 2008

CAMBRIDGESHIRE GUIDED BUSWAY

Project Team
Client: Cambridgeshire
        County Council
Consulting Engineers: Arup
Main Contractor: Edmund Nuttall Ltd
Start Date: March 2007
Completion Date: 2009

A1 PETERBOROUGH TO BLYTHE GRADE SEPARATED JUNCTIONS

Project Team
Client:Highways Agency
Consulting Engineers: Atkins / Mouchel Parkman
Main Contractor: Interserve Project Services Ltd
Start Date: 2007
Completion Date: 2008

        

EAST LONDON LINE ENABLING WORKS

SOUTHPORT MARINE PARADE LINK BRIDGE

Job Brief
Supplied: 60 Pot Bearings

Project Team
Client: TFL
(Transport for London)
Main Contractor: Taylor Woodrow
Consultant Engineer: Faber Maunsell
Start Date: 2005
Completion Date: 2007

Background Information
The East London Line was opened around 1869 and was originally known as the East London Railway, it runs under the Thames through the Thames Tunnel, which is the oldest part of the Undergrounds infrastructure. The line was originally operated by six different railway companies (later reduced to two) but became part of the London Underground in 1933 and came into public ownership in 1948.
Taylor Woodrow was awarded the contract to upgrade or replace 21 structures along the East London Line. This
scheme was issued to Taylor Woodrow once it was announced that the UK would be hosting the 2012 Olympics.

Ekspans Involvement
Ekspan worked closely with the consultant engineers at Faber Maunsell in order to provide a complete design for each
bearing on the various new structures. In total Ekspan supplied over 60 bearings to the project spread over 10 structures.
The structures incorporating Ekspan Bearings are as follows:
Pearson Street, Cremer Street, Arbutus Street, Union Walk 2, Lee Street, How Street, Middleton Road Bridge, Haggerston Street, Dunston street and the competition winning Regents Canal Bridge (as picture shown above).
Most of the bearings were of standard design however some of the bearings at Arbutus Street and Pearson Street required a complicated bespoke uplift bearing design. Ekspan successfully carried out the supply contract to all of the structures within the manufacture period specified.
All of the bearings supplied were manufactured in the UK by Ekspan Ltd and incorporated the following quality enhancements.
1. Tig Welded mirror polished stainless steel mating sliding surfaces.
2. Dimpled and greased Virgin PTFE
3. 2 Brass ring sets which sit on a recessed natural rubber pad.
These features enhance the bearing life and reduce the risk of premature replacement being required. These quality features are included as standard on all Ekspan Ltd Pot type bearings.

Head Office, UK & Export Sales

Compass Works, 410 Brightside Lane, Sheffield S9 2SP
Tel: +44 (0) 114 2611126 Fax: +44 (0) 114 2611165
Email: enquiry@ekspan.co.uk Website: www.ekspan.com

Copyright 2008 © Ekspan.Com, Ekspan Terms, Design By Zikis